Pinaka Aerospace Solutions is at the forefront of revolutionizing aerospace technology, particularly with the enhancement of the Rolls-Royce Adour MK804 and MK 811 Engines Turbine Gas Temperature (TGT) Amplifiers for the SEPECAT Jaguar fleet operated by the Indian Air Force. This midlife upgrade project addresses the frequent failures associated with the legacy OEM Amplifier, ensuring the continued operational efficiency of the engines until the mid-2030s when these aircraft will be decommissioned. Pinaka’s indigenous TGT Amplifier uses cutting-edge technology, featuring a sensing circuit for pre-start engine rotational direction verification and sensors that dynamically adjust fuel flow based on gas temperature and low-pressure compressor speed.
January 2024

NGC Energy India Pvt. Ltd: 15,000 MT Storage Tanks at Krishnapattanam Port, AP

NGC Energy India Pvt. Ltd. entrusted Sharp Tanks and Structurals P. Ltd. with a comprehensive project at Krishnapattanam Port, Andhra Pradesh. The assignment involved the design, engineering, procurement, supply, fabrication, inspection, transportation, storage, construction, installation, insulation design, and application, as well as testing, pre-commissioning, and commissioning of two state- of-the-art Full Integrity Double Walled Storage Tanks, each with an impressive capacity of 15,000 MT.

January 2024

Accelerating Innovation: Zetwerk’s Rapid Deployment of ‘Make in India’ Smartwatches

A leading Indian mobile accessories brand sought to localize its smartwatch manufacturing. The decision to produce smartwatches domestically was to contribute to the 'Make in India' initiative while ensuring a swift time-to-market for their products.

January 2024

Shaping the Future: Strategic Expansion in Solar Pile Supply for US EPC Firms

For the solar energy industry, the importance of a dependable and cost-effective supply chain cannot ignored. Zetwerk-Unimacts has positioned itself as a transformative entity, playing a crucial role in reshaping the worldwide landscape of solar pile supply for US-based EPC firms. On account of rising steel and shipping costs, the company initiated a strategic plan, commencing with establishing a pile factory in North America.

January 2024

IRCON EPC-04: Powering 73 TKm P-2A in West Bengal Railway Electrification

Zetwerk has been actively involved in railway electrification endeavors spanning 600 track kilometers (TKm) across West Bengal. A notable milestone in our portfolio is the completion of 73 TKm P-2A CRS (Commissioner of Railway Safety) on March 28, 2023. This project showcases Zetwerk's efforts to enhance railway electrification infrastructure and contribute to the modernization of transportation networks in the region.

January 2024

Electrifying Railways in Karnataka: CORE Gr. 295 & 296 Projects of 64 TKm Delivered

Zetwerk undertook two critical railway electrification projects, namely CORE Gr. 295 and CORE Gr. 296, covering a combined distance of 64 TKm in Karnataka. These projects aimed to contribute significantly to the modernization of rail infrastructure, showcasing Zetwerk's commitment to delivering high-quality and reliable solutions in the transportation sector.

January 2024

Harnessing The Sun Down Under: Overcoming Challenges with Global Legal Expertise

In the competitive field of renewable energy, the Australian solar tracker market posed challenges for a global industry leader due to limited local suppliers, rising operational costs, and strict import regulations. To overcome these hurdles, Zetwerk-Unimacts swiftly engaged trade attorneys from the USA and Australia, unraveling complex market regulations. Simultaneously, Zetwerk-Unimacts undertook a comprehensive product redesign, leveraging their engineering expertise to optimize assemblies, reduce costs, and uphold quality standards. This dual approach, combining legal acumen and technical innovation, proved pivotal.

January 2024

Revolutionising Fitness Tech: Delivering 10,000 Precision Rings per Month

Given the strict timeline of three months to get to a production of 10,000 rings per month, ZETWERK got straight to work. Our dedicated teams for project management & quality control worked to: Challenge What does it take to build the next revolution in fitness technology? A fitness tracker that literally wraps around your finger […]

January 2024

SHV Energy Pvt. Ltd. Project: Two 15,000 MT Refrigerated Storage Tanks Delivered

Sharp Tanks and Structurals Pvt. Ltd. (STSPL) was engaged by SHV Energy Pvt Ltd, a significant player in the energy sector based in Tuticorin, Tamil Nadu to execute a comprehensive project spanning the design, engineering, procurement, fabrication, and commissioning of two refrigerated storage tanks of 15,000 MT each. Specifically engineered for the storage of propane and butane, the project aimed to meet the exacting standards of the BVIS 2022 guidelines. The project scope was to be completed in phases, including third-party inspection, mechanical completion, pre- commissioning, commissioning assistance, calibration, and demonstration of performance guarantee parameters.

January 2024

Excellence Delivered: Streamlined Supply Chain Triples Demand for Aluminum Extrusions

Managing the launch of 31 aluminum extrusion dies is no easy feat; add a strict timeline to the mix and you’ve got a challenge on your hands. That’s where Zetwerk came in and took on the project head on. Zetwerk mobilized its robust network of suppliers to manufacture custom aluminum extrusions to exact specifications. Our dedicated Quality Manager and quality expert personnel were brought in to ensure quality control at every stage of the production process. Zetwerk’s dedicated Project Manager and our proprietary in-house project management software enabled complete visibility of project progress, from design to production to delivery. In addition, we worked closely with the client’s SQE team to audit the production plant and inspect all the extrusions. Approvals are an important part of any precision manufacturing project. In order to adhere to the client’s tight timelines, Zetwerk engaged additional resources to expedite the DFM/PPAP/FAIR schedule.

January 2024

Revamp Done: Upgrading 10,000 MT Double-Wall Refrigerated LPG Storage Tanks for IOCL

Sharp Tanks and Structurals P. Ltd. undertook a significant project for the Indian Oil Corporation Limited (IOCL) at Kandla, Gujarat. This project involved revamping Double Wall Refrigerated LPG Storage Tanks and Allied Facilities at the LPG Import Plant. The scope of work included comprehensive upgrades to enhance the operational efficiency and safety of the existing facilities. The project specifically focused on double-wall refrigerated LPG Storage Tanks, each with a capacity of 10,000 MT. The outer tank had dimensions of 46.8 meters in diameter and 20 meters in height.

January 2024

ZETWERK and L&T’s Triumph: Mumbai-Ahmedabad Bullet Train Girder Fabrication

Zetwerk was approached by L&T to build 21- meter-high steel girders on the Mumbai-Ahmedabad Bullet Train Corridor. Zetwerk has demonstrated its prowess in the fabrication and erection of these steel girders for this prestigious project by fabricating and erecting these structures to highly exacting specifications that were earlier not accomplished in India.

January 2024

AEGIS GAS Expansion: 24,000 MT Cryogenic LPG Storage Tanks in Kandla Executed

Sharp Tanks and Structurals Pvt. Ltd. undertook a significant project for AEGIS GAS at Kandla, Gujarat, involving the fabrication, erection, and testing of two cryogenic storage LPG tanks. These tanks, with a capacity of 24,000 MT each, were designed to store a combination of propane and butane. The project was initiated in partnership with PDIL as the client, with the execution taking place throughout 2021.

January 2024

Challenge Overcome: Delivering 12,500 MT Cryogenic LPG Tanks for AEGIS Logistics

Sharp Tanks and Structurals P. Ltd., undertook a significant project for Aegis Logistics Ltd. in Haldia, West Bengal. The project involved the fabrication, erection, welding, testing, and calibration of two Cryogenic LPG Double-walled Tanks with Suspended Decks.

January 2024

Digitised AKIPS Missile Testing: Built for Efficiency, Adaptability, and Performance

Facing challenges with OEM-supplied missile checkout system, obsolete technologies, hard to maintain, bulky and difficult to deploy, inefficient to operate – Pinaka seized an opportunity for innovation. The Digitised AKIPS, with its compact design, overcame bulkiness, enabling easy transport and deployment in diverse environments. Simultaneous testing of two missiles enhanced throughput, addressing time limitations. Legacy programs were replaced with contemporary software technologies, better IPC and modern GUI for ease of operations, streamlining configuration and execution processes. The impact of Digitised AKIPS on missile check-out is profound. It comprehensively evaluates subsystems simultaneously, optimizing assessments, saving valuable time during wartime operations, and importantly, improving trustworthiness of the launch. The modernized interface ensures easy adaptation to evolving requirements, placing Digitised AKIPS at the forefront of missile testing technology. Pinaka's innovation sets a new standard for efficiency and adaptability in defense technology, ensuring reliability and performance for future defense forces.

January 2024

Pinaka’s DFCC-ADC Simulator: Ensuring Flight Control Integrity

As a Fly-By-Wire aircraft, the Tejas LCA relies heavily on several systems that are computer-controlled in real-time for optimal performance. The Flight Control System of the Tejas uses various inputs such as airspeed, angle of attack, side slip, etc., from the environment, and also the pilot’s inputs for pitch, roll, yaw and thrust, to then control the movement of the surface actuators using the control laws implemented in the Digital Flight Control Computer (DFCC). The DFCC and the Air Data Computer (ADC) are thus very critical to the performance of the Tejas LCA to achieve the pilot’s intended flight path.

January 2024

Mission System Integration Rig (MSyIR): Enhanced Validation for Air Surveillance

The NETRA Airborne Early Warning and Control System is crucial for the IAF's surveillance and tracking efforts across air, sea, and land targets, including ballistic missiles. Commissioned by the Centre for Airborne Systems (CABS), Pinaka developed a Mission System Integration Rig (MSyIR) to validate performance characteristics of avionic subsystems within NETRA AEW&CS. MSyIR replicates the aircraft environment, conducting performance tests for RF signal transmission and reception before aircraft installation. Pinaka, responsible for designing and integrating MSyIR with the Embraer EJ-145 aircraft platform, met stringent timelines dictated by DRDO's commitments to the Indian Air Force. Pinaka's technical team decomposed the system into individual components, ensuring clear interfaces and functionality. Simultaneously, the program management team initiated planning, scheduling, component sourcing, and risk management, delivering a high-quality product on time. Through Pinaka's design and development capabilities, CABS/DRDO delivered a fully indigenous product efficiently. Pinaka's engineering team, experienced with the IAF's operations requirements, achieved an deployment-ready solution. Effective program management practices, including partner selection, strict schedules, quality checks, and optimal working capital leverage, contributed to the successful early delivery of the Mission Systems Integration Rig.

January 2024

Challenges and Solutions: Developing Side-Step Assembly for an Electric Two-Wheeler

Ather Energy, a Bengaluru-based electric two-wheeler manufacturer, faced a significant challenge in developing a side-step assembly for their new vehicle model within a tight 12-week timeframe. The precision manufacturing sector's intricate nature demanded effective management of multiple commodities, necessitating a robust supply chain. Challenges included identifying suitable supply chain partners, setting up seamless assembly lines, maintaining stringent quality standards across diverse components, and coordinating precise delivery plans to meet the demanding timeline.

January 2024

Empowering Sustainability: Impactful Solutions in Solar Project Execution

When JSW Energy Limited was looking to expand its operations in the solar energy space, the company required a partner to aid in end-to-end manufacturing operations – from design to execution. With ZETWERK’s ongoing operations in the renewable energy sector, executing close to 1 GW of solar projects in India, this partnership was the perfect […]

Given the strict timeline of three months to get to a production of 10,000 rings per month, ZETWERK got straight to work. Our dedicated teams for project management & quality control worked to: Challenge What does it take to build the next revolution in fitness technology? A fitness tracker that literally wraps around your finger […]
January 2024

Excellence Delivered: Streamlined Supply Chain Triples Demand for Aluminum Extrusions

Managing the launch of 31 aluminum extrusion dies is no easy feat; add a strict timeline to the mix and you’ve got a challenge on your hands. That’s where Zetwerk came in and took on the project head on. Zetwerk mobilized its robust network of suppliers to manufacture custom aluminum extrusions to exact specifications. Our dedicated Quality Manager and quality expert personnel were brought in to ensure quality control at every stage of the production process. Zetwerk’s dedicated Project Manager and our proprietary in-house project management software enabled complete visibility of project progress, from design to production to delivery. In addition, we worked closely with the client’s SQE team to audit the production plant and inspect all the extrusions. Approvals are an important part of any precision manufacturing project. In order to adhere to the client’s tight timelines, Zetwerk engaged additional resources to expedite the DFM/PPAP/FAIR schedule.

January 2024

Challenges and Solutions: Developing Side-Step Assembly for an Electric Two-Wheeler

Ather Energy, a Bengaluru-based electric two-wheeler manufacturer, faced a significant challenge in developing a side-step assembly for their new vehicle model within a tight 12-week timeframe. The precision manufacturing sector's intricate nature demanded effective management of multiple commodities, necessitating a robust supply chain. Challenges included identifying suitable supply chain partners, setting up seamless assembly lines, maintaining stringent quality standards across diverse components, and coordinating precise delivery plans to meet the demanding timeline.

Pinaka Aerospace Solutions is at the forefront of revolutionizing aerospace technology, particularly with the enhancement of the Rolls-Royce Adour MK804 and MK 811 Engines Turbine Gas Temperature (TGT) Amplifiers for the SEPECAT Jaguar fleet operated by the Indian Air Force. This midlife upgrade project addresses the frequent failures associated with the legacy OEM Amplifier, ensuring the continued operational efficiency of the engines until the mid-2030s when these aircraft will be decommissioned. Pinaka’s indigenous TGT Amplifier uses cutting-edge technology, featuring a sensing circuit for pre-start engine rotational direction verification and sensors that dynamically adjust fuel flow based on gas temperature and low-pressure compressor speed.
January 2024

Digitised AKIPS Missile Testing: Built for Efficiency, Adaptability, and Performance

Facing challenges with OEM-supplied missile checkout system, obsolete technologies, hard to maintain, bulky and difficult to deploy, inefficient to operate – Pinaka seized an opportunity for innovation. The Digitised AKIPS, with its compact design, overcame bulkiness, enabling easy transport and deployment in diverse environments. Simultaneous testing of two missiles enhanced throughput, addressing time limitations. Legacy programs were replaced with contemporary software technologies, better IPC and modern GUI for ease of operations, streamlining configuration and execution processes. The impact of Digitised AKIPS on missile check-out is profound. It comprehensively evaluates subsystems simultaneously, optimizing assessments, saving valuable time during wartime operations, and importantly, improving trustworthiness of the launch. The modernized interface ensures easy adaptation to evolving requirements, placing Digitised AKIPS at the forefront of missile testing technology. Pinaka's innovation sets a new standard for efficiency and adaptability in defense technology, ensuring reliability and performance for future defense forces.

January 2024

Pinaka’s DFCC-ADC Simulator: Ensuring Flight Control Integrity

As a Fly-By-Wire aircraft, the Tejas LCA relies heavily on several systems that are computer-controlled in real-time for optimal performance. The Flight Control System of the Tejas uses various inputs such as airspeed, angle of attack, side slip, etc., from the environment, and also the pilot’s inputs for pitch, roll, yaw and thrust, to then control the movement of the surface actuators using the control laws implemented in the Digital Flight Control Computer (DFCC). The DFCC and the Air Data Computer (ADC) are thus very critical to the performance of the Tejas LCA to achieve the pilot’s intended flight path.

January 2024

Mission System Integration Rig (MSyIR): Enhanced Validation for Air Surveillance

The NETRA Airborne Early Warning and Control System is crucial for the IAF's surveillance and tracking efforts across air, sea, and land targets, including ballistic missiles. Commissioned by the Centre for Airborne Systems (CABS), Pinaka developed a Mission System Integration Rig (MSyIR) to validate performance characteristics of avionic subsystems within NETRA AEW&CS. MSyIR replicates the aircraft environment, conducting performance tests for RF signal transmission and reception before aircraft installation. Pinaka, responsible for designing and integrating MSyIR with the Embraer EJ-145 aircraft platform, met stringent timelines dictated by DRDO's commitments to the Indian Air Force. Pinaka's technical team decomposed the system into individual components, ensuring clear interfaces and functionality. Simultaneously, the program management team initiated planning, scheduling, component sourcing, and risk management, delivering a high-quality product on time. Through Pinaka's design and development capabilities, CABS/DRDO delivered a fully indigenous product efficiently. Pinaka's engineering team, experienced with the IAF's operations requirements, achieved an deployment-ready solution. Effective program management practices, including partner selection, strict schedules, quality checks, and optimal working capital leverage, contributed to the successful early delivery of the Mission Systems Integration Rig.

For the solar energy industry, the importance of a dependable and cost-effective supply chain cannot ignored. Zetwerk-Unimacts has positioned itself as a transformative entity, playing a crucial role in reshaping the worldwide landscape of solar pile supply for US-based EPC firms. On account of rising steel and shipping costs, the company initiated a strategic plan, commencing with establishing a pile factory in North America.
January 2024

IRCON EPC-04: Powering 73 TKm P-2A in West Bengal Railway Electrification

Zetwerk has been actively involved in railway electrification endeavors spanning 600 track kilometers (TKm) across West Bengal. A notable milestone in our portfolio is the completion of 73 TKm P-2A CRS (Commissioner of Railway Safety) on March 28, 2023. This project showcases Zetwerk's efforts to enhance railway electrification infrastructure and contribute to the modernization of transportation networks in the region.

January 2024

Electrifying Railways in Karnataka: CORE Gr. 295 & 296 Projects of 64 TKm Delivered

Zetwerk undertook two critical railway electrification projects, namely CORE Gr. 295 and CORE Gr. 296, covering a combined distance of 64 TKm in Karnataka. These projects aimed to contribute significantly to the modernization of rail infrastructure, showcasing Zetwerk's commitment to delivering high-quality and reliable solutions in the transportation sector.

January 2024

Harnessing The Sun Down Under: Overcoming Challenges with Global Legal Expertise

In the competitive field of renewable energy, the Australian solar tracker market posed challenges for a global industry leader due to limited local suppliers, rising operational costs, and strict import regulations. To overcome these hurdles, Zetwerk-Unimacts swiftly engaged trade attorneys from the USA and Australia, unraveling complex market regulations. Simultaneously, Zetwerk-Unimacts undertook a comprehensive product redesign, leveraging their engineering expertise to optimize assemblies, reduce costs, and uphold quality standards. This dual approach, combining legal acumen and technical innovation, proved pivotal.

January 2024

Empowering Sustainability: Impactful Solutions in Solar Project Execution

When JSW Energy Limited was looking to expand its operations in the solar energy space, the company required a partner to aid in end-to-end manufacturing operations – from design to execution. With ZETWERK’s ongoing operations in the renewable energy sector, executing close to 1 GW of solar projects in India, this partnership was the perfect […]

A leading Indian mobile accessories brand sought to localize its smartwatch manufacturing. The decision to produce smartwatches domestically was to contribute to the 'Make in India' initiative while ensuring a swift time-to-market for their products.
NGC Energy India Pvt. Ltd. entrusted Sharp Tanks and Structurals P. Ltd. with a comprehensive project at Krishnapattanam Port, Andhra Pradesh. The assignment involved the design, engineering, procurement, supply, fabrication, inspection, transportation, storage, construction, installation, insulation design, and application, as well as testing, pre-commissioning, and commissioning of two state- of-the-art Full Integrity Double Walled Storage Tanks, each with an impressive capacity of 15,000 MT.
January 2024

SHV Energy Pvt. Ltd. Project: Two 15,000 MT Refrigerated Storage Tanks Delivered

Sharp Tanks and Structurals Pvt. Ltd. (STSPL) was engaged by SHV Energy Pvt Ltd, a significant player in the energy sector based in Tuticorin, Tamil Nadu to execute a comprehensive project spanning the design, engineering, procurement, fabrication, and commissioning of two refrigerated storage tanks of 15,000 MT each. Specifically engineered for the storage of propane and butane, the project aimed to meet the exacting standards of the BVIS 2022 guidelines. The project scope was to be completed in phases, including third-party inspection, mechanical completion, pre- commissioning, commissioning assistance, calibration, and demonstration of performance guarantee parameters.

January 2024

Revamp Done: Upgrading 10,000 MT Double-Wall Refrigerated LPG Storage Tanks for IOCL

Sharp Tanks and Structurals P. Ltd. undertook a significant project for the Indian Oil Corporation Limited (IOCL) at Kandla, Gujarat. This project involved revamping Double Wall Refrigerated LPG Storage Tanks and Allied Facilities at the LPG Import Plant. The scope of work included comprehensive upgrades to enhance the operational efficiency and safety of the existing facilities. The project specifically focused on double-wall refrigerated LPG Storage Tanks, each with a capacity of 10,000 MT. The outer tank had dimensions of 46.8 meters in diameter and 20 meters in height.

January 2024

AEGIS GAS Expansion: 24,000 MT Cryogenic LPG Storage Tanks in Kandla Executed

Sharp Tanks and Structurals Pvt. Ltd. undertook a significant project for AEGIS GAS at Kandla, Gujarat, involving the fabrication, erection, and testing of two cryogenic storage LPG tanks. These tanks, with a capacity of 24,000 MT each, were designed to store a combination of propane and butane. The project was initiated in partnership with PDIL as the client, with the execution taking place throughout 2021.

January 2024

Challenge Overcome: Delivering 12,500 MT Cryogenic LPG Tanks for AEGIS Logistics

Sharp Tanks and Structurals P. Ltd., undertook a significant project for Aegis Logistics Ltd. in Haldia, West Bengal. The project involved the fabrication, erection, welding, testing, and calibration of two Cryogenic LPG Double-walled Tanks with Suspended Decks.

Zetwerk was approached by L&T to build 21- meter-high steel girders on the Mumbai-Ahmedabad Bullet Train Corridor. Zetwerk has demonstrated its prowess in the fabrication and erection of these steel girders for this prestigious project by fabricating and erecting these structures to highly exacting specifications that were earlier not accomplished in India.