Zetwerk has aided in the design, supply, execution, and commissioning of Bangladesh’s largest solar park. The 275 MWp solar power project is the largest in the country and has commenced power generation & transmission to the national grid. Given the tight timeline and variables at play, our in-house project management software helped optimize the time […]
Champa City, located in Chhattisgarh, was facing significant logistical challenges due to the COVID-19 pandemic. One of the critical infrastructure projects affected was the construction of a rail bridge aimed at reducing rail traffic congestion. The timely execution of this project became a pressing concern due to transportation restrictions and the need to transport heavy […]
The market for nail care products has seen significant growth over the years, with a rising demand for high-quality nail clippers that offer precision, durability, and ergonomic design. A popular American brand approached ZETWERK to produce a surgical-grade stainless steel blades, force-reducing mechanism, and 180° adjustable swivel head for their nail clipper. Manufacturing these nail […]
A leading oil-producing PSU entrusted ZETWERK with supplying, fabricating, erecting, testing, and commissioning 3 x 600 MT mounded-type pressure vessels for LPG storage and three cone-roof firewater storage tanks. This venture represents a project in excellence, innovation, and socioeconomic development. Moreover, the harsh environmental conditions of Rajasthan, including temperature fluctuations and sandstorms, added complexity to […]
ZETWERK is redeveloping Kota Railway Station currently on a turnkey basis. We will be executing the entire project that is spread across an area of around 1.5 lac SQFT. This will include detailed designing of the station building and associated structures, and construction of all associated rooms, structural works, and MEP works. This project started […]
ZETWERK manages over 5,000 domestic customer deliveries monthly. However, we faced significant operational challenges because GPS tracking is largely non-existent for logistics operations. Additionally, compliance checks required intensive scrutiny, and the volume of shipments meant that would have needed to deploy dedicated manpower, which would have proven counter-productive to validate all vehicular movement. Therefore, the […]
A leading Indian gas PSU was required to enhance its infrastructure by installing pressure vessels critical for its operations. The project involved the supply, manufacturing, testing, and delivery of Pressure Vessel – CS (26-50 MM) and Pressure Vessel – CS (UP to 25 MM) under Limited Domestic Competitive Bidding. These vessels were integral to their […]
The Osa AK missile system, a Russian-origin system acquired by India in the 1980s, is for the country’s air defense strategy. Designed for quick reaction surfaceto-air defense, it is deployed for airfield protection by the Indian Air Force and tank protection by the Indian Army. Over the years, the system faced challenges in accuracy, operational […]
A leading Indian company required a significant expansion project at Dolvi and Bellary. The focal point of this endeavor was the establishment of a Crushing & Briquetting Plant. Given the complexity and scale of the project, they partnered with ZETWERK to oversee the fabrication, installation, and commissioning of equipment. Challenge Coordinating Diverse Structures and Vendors: […]
Pinaka Aerospace Solutions is at the forefront of revolutionizing aerospace technology, particularly with the enhancement of the Rolls-Royce Adour MK804 and MK 811 Engines Turbine Gas Temperature (TGT) Amplifiers for the SEPECAT Jaguar fleet operated by the Indian Air Force. This midlife upgrade project addresses the frequent failures associated with the legacy OEM Amplifier, ensuring […]
A leading Indian energy organization entrusted Sharp Tanks and Structurals P. Ltd., a ZETWERK company, with a comprehensive project at Krishnapattanam Port, Andhra Pradesh. The assignment involved the design, engineering, procurement, supply, fabrication, inspection, transportation, storage, construction, installation, insulation design, and application, as well as testing, pre-commissioning, and commissioning of two state-of-the-art Full Integrity Double […]
A leading Indian mobile accessories brand sought to localize its smartwatch manufacturing. The decision to produce smartwatches domestically was to contribute to the ‘Make in India’ initiative while ensuring a swift time-to-market for their products. Challenge The challenge brand needed to find an end-to-end manufacturing partner and deliver the first batch of smartwatches within an […]
For the solar energy industry, the importance of a dependable and cost-effective supply chain cannot ignored. Zetwerk-Unimacts has positioned itself as a transformative entity, playing a crucial role in reshaping the worldwide landscape of solar pile supply for US-based EPC firms. On account of rising steel and shipping costs, the company initiated a strategic plan, […]
ZETWERK has been actively involved in railway electrification endeavors spanning 600 track kilometers (TKm) across West Bengal. A notable milestone in our portfolio is the completion of 73 TKm P-2A CRS (Commissioner of Railway Safety) on March 28, 2023. This project showcases ZETWERK’s efforts to enhance railway electrification infrastructure and contribute to the modernization of […]
ZETWERK undertook two critical railway electrification projects, namely CORE Gr. 295 and CORE Gr. 296, covering a combined distance of 64 TKm in Karnataka. These projects aimed to contribute significantly to the modernization of rail infrastructure, showcasing ZETWERKS’s commitment to delivering high-quality and reliable solutions in the transportation sector. Challenge The projects presented ZETWERK with […]
In the competitive field of renewable energy, the Australian solar tracker market posed challenges for a global industry leader due to limited local suppliers, rising operational costs, and strict import regulations. To overcome these hurdles, Zetwerk-Unimacts swiftly engaged trade attorneys from the USA and Australia, unraveling complex market regulations. Simultaneously, Zetwerk-Unimacts undertook a comprehensive product […]
Given the strict timeline of 3 months to get to a production of 10,000 rings per month, Zetwerk got straight to work. Our dedicated teams for project management & quality control worked to: Challenge What does it take to build the next revolution in fitness technology? A fitness tracker that literally wraps around your finger […]
Sharp Tanks and Structurals Pvt. Ltd. (STSPL), a ZETWERK company. was engaged by a leading player in the energy sector based in Tuticorin, Tamil Nadu to execute a comprehensive project spanning the design, engineering, procurement, fabrication, and commissioning of two refrigerated storage tanks of 15,000 MT each. Specifically engineered for the storage of propane and […]
Managing the launch of 31 aluminum extrusion dies is no easy feat; add a strict timeline to the mix and you have a challenge. That’s where ZETWERK came in and took on the project head-on. ZETWERK mobilized its robust network of suppliers to manufacture custom aluminum extrusions to exact specifications. Our dedicated Quality Manager and […]
Sharp Tanks and Structurals P. Ltd., a ZETWERK company undertook a significant project for an Indian oil PSU at Kandla, Gujarat. This project involved revamping Double Wall Refrigerated LPG Storage Tanks and Allied Facilities at the LPG Import Plant. The scope of work included comprehensive upgrades to enhance the operational efficiency and safety of the […]
ZETWERK was approached by a large Indian MNC to build 21-meter-high steel girders on the Mumbai-Ahmedabad Bullet Train Corridor. ZETWERK has demonstrated its prowess in the fabrication and erection of these steel girders for this prestigious project by fabricating and erecting these structures to highly exacting specifications that were earlier not accomplished in India. Challenge […]
Sharp Tanks and Structurals Pvt. Ltd., a ZETWERK company, undertook a significant project for a leading Indian energy supplier at Kandla, Gujarat, involving the fabrication, erection, and testing of two cryogenic storage LPG tanks. These tanks, with a capacity of 24,000 MT each, were designed to store a combination of propane and butane. The project […]
Sharp Tanks and Structurals P. Ltd., undertook a significant project for a major Indian energy company in Haldia, West Bengal. The project involved the fabrication, erection, welding, testing, and calibration of two Cryogenic LPG Double-walled Tanks with Suspended Decks. Challenge These tanks, with a massive capacity of 12,500 MT each, were designed to meet the […]
Facing challenges with OEM-supplied missile checkout system, obsolete technologies, hard to maintain, bulky and difficult to deploy, inefficient to operate – Pinaka seized an opportunity for innovation. The Digitized AKIPS, with its compact design, overcame bulkiness, enabling easy transport and deployment in diverse environments. Simultaneous testing of two missiles enhanced throughput, addressing time limitations. Legacy […]
As a Fly-By-Wire aircraft, the Tejas LCA relies heavily on several systems that are computer-controlled in real-time for optimal performance. The Flight Control System of the Tejas uses various inputs such as airspeed, angle of attack, side slip, etc., to then control the movement of the surface actuators using the control laws implemented in the […]
The NETRA Airborne Early Warning and Control System is crucial for the IAF’s surveillance and tracking efforts across air, sea, and land targets, including ballistic missiles. Commissioned by the Centre for Airborne Systems (CABS), Pinaka Aerospace Solutions. a ZETWERK company developed a Mission System Integration Rig (MSyIR) to validate performance characteristics of avionic subsystems within […]
Managing multiple commodities in a project entails orchestrating sourcing players, establishing dedicated assembly lines, and accounting for quality, aesthetics, and demand fluctuations. This complexity involves numerous moving parts. We identified suitable partners for manufacturing this component, set targeted timelines, and ensured a streamlined Assembly Line managed by skilled operators. Mistake-proofing techniques were implemented to enhance […]
When a leading Indian conglomerate was looking to expand its operations in the solar energy space, the company required a partner to aid in end-to-end manufacturing operations – from design to execution. With Zetwerk’s ongoing operations in the renewable energy sector, executing close to 1 GW of solar projects in India, this partnership was the […]
Managing the launch of 31 aluminum extrusion dies is no easy feat; add a strict timeline to the mix and you have a challenge. That’s where ZETWERK came in and took on the project head-on. ZETWERK mobilized its robust network of suppliers to manufacture custom aluminum extrusions to exact specifications. Our dedicated Quality Manager and […]
Managing multiple commodities in a project entails orchestrating sourcing players, establishing dedicated assembly lines, and accounting for quality, aesthetics, and demand fluctuations. This complexity involves numerous moving parts. We identified suitable partners for manufacturing this component, set targeted timelines, and ensured a streamlined Assembly Line managed by skilled operators. Mistake-proofing techniques were implemented to enhance […]
Facing challenges with OEM-supplied missile checkout system, obsolete technologies, hard to maintain, bulky and difficult to deploy, inefficient to operate – Pinaka seized an opportunity for innovation. The Digitized AKIPS, with its compact design, overcame bulkiness, enabling easy transport and deployment in diverse environments. Simultaneous testing of two missiles enhanced throughput, addressing time limitations. Legacy […]
As a Fly-By-Wire aircraft, the Tejas LCA relies heavily on several systems that are computer-controlled in real-time for optimal performance. The Flight Control System of the Tejas uses various inputs such as airspeed, angle of attack, side slip, etc., to then control the movement of the surface actuators using the control laws implemented in the […]
The NETRA Airborne Early Warning and Control System is crucial for the IAF’s surveillance and tracking efforts across air, sea, and land targets, including ballistic missiles. Commissioned by the Centre for Airborne Systems (CABS), Pinaka Aerospace Solutions. a ZETWERK company developed a Mission System Integration Rig (MSyIR) to validate performance characteristics of avionic subsystems within […]
For the solar energy industry, the importance of a dependable and cost-effective supply chain cannot ignored. Zetwerk-Unimacts has positioned itself as a transformative entity, playing a crucial role in reshaping the worldwide landscape of solar pile supply for US-based EPC firms. On account of rising steel and shipping costs, the company initiated a strategic plan, […]
ZETWERK has been actively involved in railway electrification endeavors spanning 600 track kilometers (TKm) across West Bengal. A notable milestone in our portfolio is the completion of 73 TKm P-2A CRS (Commissioner of Railway Safety) on March 28, 2023. This project showcases ZETWERK’s efforts to enhance railway electrification infrastructure and contribute to the modernization of […]
ZETWERK undertook two critical railway electrification projects, namely CORE Gr. 295 and CORE Gr. 296, covering a combined distance of 64 TKm in Karnataka. These projects aimed to contribute significantly to the modernization of rail infrastructure, showcasing ZETWERKS’s commitment to delivering high-quality and reliable solutions in the transportation sector. Challenge The projects presented ZETWERK with […]
In the competitive field of renewable energy, the Australian solar tracker market posed challenges for a global industry leader due to limited local suppliers, rising operational costs, and strict import regulations. To overcome these hurdles, Zetwerk-Unimacts swiftly engaged trade attorneys from the USA and Australia, unraveling complex market regulations. Simultaneously, Zetwerk-Unimacts undertook a comprehensive product […]
When a leading Indian conglomerate was looking to expand its operations in the solar energy space, the company required a partner to aid in end-to-end manufacturing operations – from design to execution. With Zetwerk’s ongoing operations in the renewable energy sector, executing close to 1 GW of solar projects in India, this partnership was the […]
A leading Indian energy organization entrusted Sharp Tanks and Structurals P. Ltd., a ZETWERK company, with a comprehensive project at Krishnapattanam Port, Andhra Pradesh. The assignment involved the design, engineering, procurement, supply, fabrication, inspection, transportation, storage, construction, installation, insulation design, and application, as well as testing, pre-commissioning, and commissioning of two state-of-the-art Full Integrity Double […]
Sharp Tanks and Structurals Pvt. Ltd. (STSPL), a ZETWERK company. was engaged by a leading player in the energy sector based in Tuticorin, Tamil Nadu to execute a comprehensive project spanning the design, engineering, procurement, fabrication, and commissioning of two refrigerated storage tanks of 15,000 MT each. Specifically engineered for the storage of propane and […]
Sharp Tanks and Structurals P. Ltd., a ZETWERK company undertook a significant project for an Indian oil PSU at Kandla, Gujarat. This project involved revamping Double Wall Refrigerated LPG Storage Tanks and Allied Facilities at the LPG Import Plant. The scope of work included comprehensive upgrades to enhance the operational efficiency and safety of the […]
Sharp Tanks and Structurals Pvt. Ltd., a ZETWERK company, undertook a significant project for a leading Indian energy supplier at Kandla, Gujarat, involving the fabrication, erection, and testing of two cryogenic storage LPG tanks. These tanks, with a capacity of 24,000 MT each, were designed to store a combination of propane and butane. The project […]
Sharp Tanks and Structurals P. Ltd., undertook a significant project for a major Indian energy company in Haldia, West Bengal. The project involved the fabrication, erection, welding, testing, and calibration of two Cryogenic LPG Double-walled Tanks with Suspended Decks. Challenge These tanks, with a massive capacity of 12,500 MT each, were designed to meet the […]