Insights / Case Studies / ZETWERK and L&T’s Triumph: Mumbai-Ahmedabad Bullet Train Girder Fabrication

ZETWERK and L&T’s Triumph: Mumbai-Ahmedabad Bullet Train Girder Fabrication

Case Studies

Download PDF
Share

ZETWERK was contracted by L&T to build 21-meter-high steel girders on the Mumbai-Ahmedabad Bullet Train Corridor. ZETWERK has demonstrated its prowess in the fabrication and erection of these steel girders for this prestigious project by fabricating and erecting these structures to highly exacting specifications that were earlier not accomplished in India.

Challenge

The Mumbai-Ahmedabad Bullet Train project posed engineering challenges, necessitating advanced solutions such as the fabrication of steel girders. Initially, the lack of local expertise in India led to importing these girders from Japan. ZETWERK recognized this challenge and engaged Japanese experts at its fabrication plant to ensure compliance with the stringent Japanese manufacturing standards.

Impact

ZETWERK fabricated 10,000 metric tons of steel girders for the MAHSR project, valued at approximately Rs. 150 crore. The collaboration with Larsen & Toubro showcased ZETWERK’s prowess and demonstrated its ability to form strategic partnerships with industry leaders, harnessing collective expertise for the successful execution of complex projects.

Advantage

ZETWERK’s engagement with Japanese experts served a dual purpose – meeting project specifications and enhancing the skills of its workforce. By integrating imported expertise into its operations, ZETWERK overcame the initial challenge of lacking local knowledge. This investment in skill development ensured immediate project success and positioned ZETWERK as an industry leader with improved operational capabilities, emphasizing a commitment to excellence and continuous improvement.

Conclusion

ZETWERK’s 21-meter steel girder success is testimony to collaborative efforts. We have showcased our prowess by fabricating high-performance structures and innovating to overcome challenges. Our dual-benefit approach positions us as an industry leader, marking a significant milestone and establishing our reputation in complex steel structures.

Zetwerk’s 21-meter steel girder triumph is a testament to collaborative excellence. We showcase prowess in fabricating high-performance structures, innovating through challenges, and pioneering a dual-benefit approach.

Nishant Goel

Business Unit Head – Railways & Metro